Title: Installation and operation of SANY 245 long-leg excavator on the railway facility of Harbin Railway
Installation and operation of SANY 245 long-leg excavator on the railway facility of Harbin Railway
Case description:
A specialized excavator was successfully installed and put into operation at the construction site of the Harbin RailwaySANY 245 with raised chassis ("long legs"), designed for unloading railway trains. This equipment is a comprehensive solution that includesportal, excavator and reinforced raised chassis, which ensures high efficiency when working with loads of various types and sizes.
Main components and their functions:
Portalis made as a robust structure with two posts and a beam. It is designed to support and secure the excavator, as well as to ensure the stability and safety of the equipment during unloading. The height and strength of the portal are selected taking into account the conditions at the given site.
SANY 245 excavator— the key working module of the system, equipped with a boom, handle and bucket, possessing high digging force and maneuverability. At this facility, it is responsible for the precise capture of cargo from railway cars and their movement to the storage area.
Extended chassis ("long legs")provides the necessary height for efficient unloading of wagons and stable support during work. The structure is made of high-strength steel with rubber elements for increased stability. The chassis is adapted to railway conditions and allows for safe work without the risk of derailment.
Application results:
The use of the SANY 245 excavator with extended supports allowed:
significantly increase the efficiency of unloading operations;
ensure the safety of personnel and the stability of equipment;
adapt to the non-standard height of railway trains;
improve maneuverability and accuracy when moving loads.
Conclusion:
The SANY 245 elevated platform excavator with portal structure has proven its reliability and productivity in real-life conditions on Harbin Railway. It is ideal for projects involving railway infrastructure upgrades or maintenance that require high precision and safety.