excavator sleeper gripper
Efficiency and speed:The equipment is easy to use, quickly removes gravel and replaces sleepers in 30-60 seconds, increasing construction efficiency.
Fine alignment:The large shield can level the gravel on the road surface after replacing sleepers, ensuring the quality of construction and the stability of the road surface.
Hydraulic grip:High-performance hydraulic system ensures stable clamping during replacement, safe and reliable, suitable for all kinds of railway construction sites.
Integrated work:Integrated replacement and alignment functions, simultaneous removal, replacement and alignment operations, reducing additional procedures and labor costs.
Product Description
The sleeper excavator sleeper clamp consists of two parts: the sleeper replacement clamp and the shield plate. First, a large sheet plate is used to quickly clear the gravel from the roadbed around the replacement soft sleeper, then the replacement soft sleeper is hydraulically clamped, pulled out of the roadbed, and then the new soft sleeper is placed on the roadbed under the rails. Once the replacement is complete, the equipment's large panel board is used to evenly level the crushed road surface to ensure a level and stable path. With a clear and efficient operation process, the equipment ensures that replacement and leveling work can be carried out simultaneously, making construction work convenient and saving time.
Application scenarios
Railway Repair and Maintenance: Suitable for the regular replacement and maintenance of railway sleepers, especially on high-frequency railway lines, fast and efficient replacement of soft sleepers can effectively shorten the construction time and ensure the safe passage of the railway.
Replacement of Old or Damaged Sleepers: Used to replace sleepers that need to be replaced due to aging, damage or other reasons, effectively maintaining the overall stability of the railway structure and reducing the safety hazard of train operations.
Railway Infrastructure Construction: During the laying process of a new railway line, the equipment can be used to quickly lay and level sleepers on the track bed, which improves construction efficiency.
Emergency Repair: When track damage occurs or emergency repairs are required, the soft sleeper replacement machine can quickly clear debris from the track, secure and replace sleepers to ensure normal railroad operations can resume as quickly as possible.





